|
IUG Damage after the Israeli Attack

·
Scientific Laboratory
Building was totally damaged, which offers academic courses for undergraduate
and postgraduate students as well as serving community related to checking water
and soil.
·
Engineering & IT
Building, (donated by Prince Turkey Bin Abed Al-Aziz),
which included study labs for electricity, computer and research and a center
for Palestinian architectural heritage, was totally damaged.
·
Buildings for lecture
rooms, administration rooms and university facilities were partially damaged.

Damage Summary
1. Islamic Development Bank Building for Scientific Labs
Scientific Labs building included labs related to Science Faculty almost with
all of its departments and branches in addition to labs for Civil Engineering.
This building is consisted of six floors donated by
Islamic Development Bank offering academic help for more than 12,000 students as
well as society services. It was equipped by modern devices, one device cost
300,000 $. The following are the labs that were totally damaged:
·
Medical Technology lab
·
Chemistry labs
·
Physics Labs
·
Biology & Biotechnology labs
·
Environmental & Earth Sciences labs
·
Water & Hydraulic labs
·
Materials and Soil labs
2. Prince Turkey Bin
Abd Al-Aziz Building for Engineering & Technology
Engineering &
Technology Building included labs for the Faculty of Engineering.
This building is consisted of six floors donated by
Prince Turkey Bin Abd Al-Aziz
offering academic help for more than 3,000 students as well as
society services. It was equipped by modern devices. The following are the labs
that were totally damage:
·
Electrical Engineering Labs
·
Communicational Engineering Labs
·
Computer Engineering Labs
·
Industrial Engineering Labs
·
Architectural Engineering Labs
·
Architectural Heritage Center
·
Projects and Research Center
3. Lecture room,
Central Library, Administration and Students Activity Buildings:
A partial damage was
happened in the frontage, a shuttering of most of the windows' buildings and
destruction for most of the university furniture as well as computer labs.
First Estimation
Cost
The first estimation
cost of the damage is 15,000,000$:
|
No. |
Damage |
Costs
|
|
1 |
Islamic Development Bank Building for Scientific Labs |
7.5
Million |
|
2 |
Prince Turkey Bin Abd Al-Aziz Building for Engineering & Technology |
4.5
Million |
|
3 |
Class room, Central Library, Administration and Students Activity
Buildings: |
2.5
Million |
|
4 |
Infrastructure |
0.5
Million |
|
5 |
Total |
15
Million |
|